Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS7591 VPA 17 Central Mozambique Safe Water Programme

GS-2331 ↗ · current registry ID: GS7637

#1122of 1329 in Industrial#40of 51 in Mozambique#1573of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.1
Transparency
4.5
Claim Safety
4.0
Documentation
3.8

Audit Analysis

This Gold Standard safe-water programme in Mozambique displaces decentralised thermal energy use and has confirmed additionality, FPIC, and no reversal events. However, the verification record is undermined by over 40 material findings, a 30,370 tCO2e over-issuance in MP1, a 47% discrepancy between two verification reports on verified ERR, and a 0% leakage deduction that contradicts a 5% figure in the validation report. The project's energy-efficiency nature limits permanence risk, but the volume of calculation errors and documentation inconsistencies raises serious concerns about the reliability of the claimed credits.

Red Flags

  • Over-issuance of 30,370 tCO2e in MP1 due to incorrect borehole operating-day calculation (corrected by deduction in current period)
  • Verified ERR of 715,850 tCO2e in the March 2024 verification report contradicts 1,062,735 tCO2e in the January 2024 verification report — a 47% unexplained gap
  • Leakage deduction of 0% in the verification report contradicts a 5% figure in the December 2025 validation report; the 'quantified' justification label is inconsistent with a zero deduction
  • Double-counting of one borehole between VPAs GS7649 and GS7650 identified as a material finding
  • Water quality test parameters nearing or exceeding maximum permissible limits, with missing test reports

Credit Vintages

IssuedRetiredAvailable
2020
40,842040,842
2021
52,75852,612146
2022
53,34652,2801,066
2023
59,43557,4082,027
2024
60,0008,86551,135
2025
5,7534,5631,190
Total272,134175,72896,406

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Energy-efficiency; no reversals

Leakage

0% deduction contradicts 5% in validation

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents