GS7591 VPA 20 Central Mozambique Safe Water Programme
GS-2334 ↗ · current registry ID: GS7640
#781of 1329 in Industrial#20of 51 in Mozambique#1169of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe water programme in Central Mozambique has confirmed additionality and on-track credit delivery for the current monitoring period, but is burdened by a history of significant data quality issues, a 30,370 tCO2e over-issuance in MP1 (since corrected), non-compliance with methodology monitoring requirements, and numerous unresolved contradictions across documents. The absence of a stated buffer pool and a weak leakage justification (0% with 'deemed negligible' rationale contradicted by a 5% figure in the validation report) further erode confidence in the project's integrity safeguards.
Red Flags
- Over-issuance of 30,370 tCO2e in MP1 due to incorrect calculation of borehole operating days; corrected by deduction in subsequent period but indicates systemic MRV weakness
- Project in non-compliance with methodology requirements for parameter SDWS 23 (monitored quantity of safe water); issuance suspended for periods of non-compliance; multiple deviation requests denied
- Leakage deduction of 0% justified as 'deemed negligible' in the 2026 verification report, directly contradicted by a 5% quantified deduction in the 2025 validation report
- 26 corrective action requests and 13 clarifications raised across verification cycles, indicating persistent MRV and reporting quality issues
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction contradicted by 5% in validation
Project-specific; reassessed 2024
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →