Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS7591 VPA 21 Central Mozambique Safe Water Programme

GS-2335 ↗ · current registry ID: GS7641

#630of 1329 in Industrial#16of 51 in Mozambique#957of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Central Mozambique Safe Water Programme displaces firewood/charcoal use for water heating and has confirmed additionality with no reversal events, but is burdened by an unusually high volume of corrective actions, a 30,370 tCO2e over-issuance in an earlier monitoring period, and persistent non-compliance with methodology monitoring requirements. The project is broadly on track with its ex-ante estimates for the latest period, yet the sheer number of data-quality errors and inconsistencies across documents undermines confidence in the underlying MRV data.

Red Flags

  • Over-issuance of 30,370 tCO2e in Monitoring Period 1 due to incorrect calculation of borehole operating days; the project proponent deducted the excess in the current period, but the initial error signals weak internal QA.
  • Project was in non-compliance with methodology requirements for parameter SDWS 23 (monitored quantity of safe water); multiple deviation requests were denied and the project was required to implement flow-meter or sensor-based monitoring after 30/06/2023.
  • 26+ corrective action requests, multiple forward action requests, and numerous clarifications raised across validation and verification cycles indicate systemic data-quality and reporting weaknesses.
  • Contradiction in total ERR verified: 37,972 tCO2e (2026 verification report) versus 1,062,735 tCO2e (2025 verification report) — a ~28× discrepancy that, while likely attributable to different monitoring periods, raises questions about data traceability.
  • Leakage deduction of 0% justified as 'deemed negligible' in the 2026 verification report, while the 2025 monitoring report characterises leakage as 'quantified' — an inconsistency in how leakage is treated across documents.

Credit Vintages

IssuedRetiredAvailable
2020
14,19414,1940
2021
52,71348,1634,550
2022
53,22618,80134,425
2023
59,76758,5731,194
2024
60,00058,8001,200
2025
5,7535,638115
Total245,653204,16941,484

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible; minor doc inconsistency

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents