Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS7591 VPA 23 Central Mozambique Safe Water Programme

GS-2337 ↗ · current registry ID: GS7643

#458of 1329 in Industrial#10of 51 in Mozambique#718of 1801 in Gold Standard (GS)

5.1/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Central Mozambique Safe Water Programme displaces firewood-based water heating through rehabilitated boreholes, with VVB-confirmed additionality and no reversal events. However, a 30,370 tCO2e over-issuance in the first monitoring period, non-compliance with methodology monitoring requirements (flow meter/sensor), and the absence of a stated buffer pool raise material integrity concerns. The project delivered approximately 100% of its pro-rata ex-ante expectation for the elapsed period, but numerous data contradictions and unresolved compliance gaps limit confidence in the credit quality.

Red Flags

  • Over-issuance of 30,370 tCO2e in MP1 due to incorrect calculation of borehole operating days, requiring deduction in MP3
  • Project in non-compliance with methodology monitoring requirements for parameter SDWS 23 (flow meter/sensor); deviation request not approved; issuance suspended for non-compliance periods
  • Multiple unresolved contradictions across documents including leakage deduction (0% vs 5%), usage rate (95% vs 98%), and crediting period dates
  • 13 clarifications and 26 corrective action requests raised and resolved, indicating systemic MRV quality issues

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction; justification inconsistent across docs

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents