Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS7591 VPA 25 Central Mozambique Safe Water Programme

GS-2339 ↗ · current registry ID: GS7645

#1123of 1329 in Industrial#41of 51 in Mozambique#1574of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
3.8
Transparency
4.5
Claim Safety
3.5
Documentation
5.0

Audit Analysis

This Gold Standard safe water and cookstove project in Mozambique has VVB-confirmed additionality and no reversal events, but is undermined by a confirmed over-issuance of 30,370 tCO2e, a double-counted borehole across VPAs, a 0% leakage deduction with contradictory justifications, and 13 outstanding corrective actions. The data quality issues in the monitoring report and the absence of a buffer pool or stated CCP/CORSIA status raise meaningful over-crediting and permanence concerns.

Red Flags

  • Over-issuance of 30,370 tCO2e in MP1 due to incorrect borehole operating-day calculation, only partially corrected by deduction in the current period
  • Double counting of one borehole between VPAs GS7649 and GS7650, indicating cross-VPA data integrity failure
  • 0% leakage deduction with contradictory justifications ('quantified' in the verification report vs 'deemed negligible' in the monitoring report)
  • 13 corrective actions and 17 material findings remain open, including incomplete ER sheets and inconsistent SDG/net-benefit calculations

Credit Vintages

IssuedRetiredAvailable
2022
27,12527,1250
2023
55,00327,38327,620
2024
60,00058,8001,200
2025
5,7535,638115
Total147,881118,94628,935

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CCP and CORSIA status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents