GS7591 VPA 28 Central Mozambique Safe Water Programme
GS-2342 ↗ · current registry ID: GS7648
#1124of 1329 in Industrial#42of 51 in Mozambique#1575of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe-water programme in Mozambique displaces firewood-based water heating with electric pumps, and while additionality is VVB-confirmed and no reversals have occurred, the project carries significant integrity and claim-safety concerns. The verified emissions reductions for the 2025 monitoring period (433,968 tCO₂e) exceed the lifetime ex-ante estimate (300,000 tCO₂e) by a factor of roughly 13× on a pro-rata basis, an over-issuance of 30,370 tCO₂e was identified in MP1, and the project is in non-compliance with methodology monitoring requirements. Multiple data inconsistencies across monitoring and verification reports further erode confidence in the reported figures.
Red Flags
- Verified ERR of 433,968 tCO₂e for the 2025 monitoring period exceeds the lifetime ex-ante estimate of 300,000 tCO₂e by approximately 13× on a pro-rata basis, indicating a severe over-crediting signal
- Over-issuance of 30,370 tCO₂e in MP1 due to incorrect calculation of borehole operating days, later deducted
- Project in non-compliance with methodology monitoring requirements (parameter SDWS 23 – flow meter/sensor); multiple deviation requests not approved; issuance suspended for non-compliance periods
- Leakage deduction of 0% justified as 'deemed negligible' contradicts a 2025 monitoring report that described leakage as 'quantified'
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction; contradictory justification
Project-specific; reassessed 2024
FPIC, grievance, benefit sharing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →