Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS7591 VPA 30 Central Mozambique Safe Water Programme

GS-2344 ↗ · current registry ID: GS7650

#1020of 1329 in Industrial#30of 51 in Mozambique#1456of 1801 in Gold Standard (GS)

4.3/ 10
Integrity
3.5
Transparency
5.5
Claim Safety
4.0
Documentation
4.5

Audit Analysis

This Gold Standard safe water and cookstove project in Mozambique has confirmed additionality and no reversal events, but is undermined by a 30,370 tCO2e over-issuance of VERs, a double-counted borehole across two VPAs, a 0% leakage deduction with only a vague 'quantified' justification, and the absence of any buffer pool. The volume of material findings (17) and corrective actions (11) signals significant MRV and documentation weaknesses that erode confidence in the claimed reductions.

Red Flags

  • Over-issued VERs of 30,370 tCO2e identified in the verification report due to incorrect calculation of borehole operating days; correction required before final issuance
  • Double counting of one borehole between VPAs GS7649 and GS7650, indicating cross-VPA data integrity failure
  • 0% leakage deduction justified only as 'quantified' with no quantified figure or methodology detail in the extracted record
  • 17 material findings and 11 corrective actions logged in the verification report, including inconsistencies in SDG values, borehole counts, and water quality pass/fail percentages

Credit Vintages

IssuedRetiredAvailable
2023
29,69729,596101
2024
60,00058,8001,200
2025
5,7535,638115
Total95,45094,0341,416

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

no reversals

Leakage

0% deduction, justification vague

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA/CCP status unstated; cross-VPA overlap found

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents