GS7591 VPA 36 Zambian Central Province Safe Water
GS-2536 ↗ · current registry ID: GS7691
#846of 1329 in Industrial#20of 33 in Zambia#1246of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe-water project in Zambia's Central Province rehabilitates borehole handpumps to displace kerosene/charcoal use for water heating. While additionality is VVB-confirmed and the methodology is appropriate, the project is beset by extensive material findings: 23% water-quality failure, high mechanical failure rates, collapsed or dried-up boreholes, and numerous data-quality errors in monitoring reports. The volume of corrective actions (19 items) and the shift in leakage treatment from 'quantified' to 'deemed negligible' between verification cycles raise concerns about the robustness of the underlying claims.
Red Flags
- 23% of boreholes failed water-quality testing (turbidity) in Feb/Mar 2025, undermining the 'safe water' claim for a significant share of the project
- High frequency of mechanical failures (worn rubber kits, chains, pipe disconnections) and significant downtime (e.g., 161 down days for one borehole in 2024) suggest the displacement of thermal energy is not consistently achieved
- Multiple boreholes reported as collapsed, dried up, or with low water levels, directly threatening the physical basis of the emission-reduction claim
- Leakage justification shifted from 'quantified' (2024 verification) to 'deemed negligible' (2026 verification) without clear explanation of the methodological change
- Formula error in the usage-survey Excel file excluded the last 5 rows of data, and the number of water-collection forms was misreported (40 vs 42), indicating systemic data-quality weaknesses
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 18,736 | 3,248 | 15,488 | |
| 2024 | 50,768 | 49,753 | 1,015 | |
| 2025 | 11,246 | 0 | 11,246 | |
| Total | 80,750 | 53,001 | 27,749 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deemed negligible; justification shifted between cycles
Project-specific, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →