GS7591 VPA 51 Safe Water Supply in Nigeria
GS-4198 ↗ · current registry ID: GS12115
#715of 1329 in Industrial#35of 79 in Nigeria#1067of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe water supply project in Nigeria has a confirmed additionality test and quantified leakage deduction, but is undermined by a project-specific baseline, absence of a stated buffer pool, and an extensive list of material findings and corrective actions that raise concerns about calculation accuracy. The low extraction confidence and multiple cross-document contradictions (fNRB method, additionality verification, crediting period) further erode confidence in the reported figures.
Red Flags
- Extensive list of 20+ material findings and 30+ corrective actions spanning calculation errors (incorrect baseline access value, wrong Qp,y defaults, fNRB justification gaps) suggest the ERR calculation may not be fully reliable
- Contradiction between verification report (fNRB method: local field) and validation report (fNRB method: national default) creates uncertainty about the 0.87 fNRB value
- Contradiction on additionality verification: verification report confirms VVB verification while the validation report indicates it was not verified
- Crediting period differs between the verification report (Oct 2023–Oct 2028) and the validation report (Feb 2025–Feb 2030), creating ambiguity about the applicable period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 1,023 | 0 | 1,023 | |
| 2024 | 53,966 | 0 | 53,966 | |
| Total | 54,989 | 0 | 54,989 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific baseline, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →