Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS7591 VPA 54 Improved Cookstove Distribution in Kayonza, Bugesera and Nyamasheke Districts of Rwanda (GS12228)

GS-4176 ↗ · current registry ID: GS12228

#632of 1329 in Industrial#45of 139 in Rwanda#959of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.2
Transparency
4.8
Claim Safety
4.5
Documentation
5.2

Audit Analysis

A Gold Standard cookstove project in Rwanda with a VVB-confirmed combined additionality test, a quantified 5% leakage deduction, and no reported reversal events. However, the project is burdened by over 20 material findings, six corrective actions, multiple cross-document contradictions (fNRB method, additionality verification, crediting period), and an exact match between claimed and verified ERR that raises over-crediting concerns. The absence of a buffer pool, a lifetime ex-ante estimate, and a project-specific baseline further limit confidence in the credit's integrity.

Red Flags

  • Claimed and verified ERR are identical (163,563 tCO₂e), suggesting the VVB may not have independently re-calculated the figure rather than verifying it against primary data.
  • Over 20 material findings and 6 corrective actions across the verification and validation reports, including start-date inconsistencies, SDG value discrepancies, parameter unit errors (per-day vs per-week), and methodology application gaps.
  • The fNRB method is reported as 'local field' in the verification report but 'national default' in the monitoring report, creating uncertainty about which value underpins the 0.9 fNRB.
  • Crediting period contradicts between the monitoring report (2021–2027) and the validation report (2025–2030), making it unclear which period the 163,563 tCO₂e figure applies to.

Credit Vintages

IssuedRetiredAvailable
2023
47,2972,15545,142
2024
36,476036,476
Total83,7732,15581,618

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

5% quantified deduction

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents