GS7591 VPA 9 Northern Uganda Safe Water Project
GS-2209 ↗ · current registry ID: GS7594
#1079of 1329 in Industrial#136of 163 in Uganda#1521of 1801 in Gold Standard (GS)
Audit Analysis
The Northern Uganda Safe Water Project is a fundamentally sound avoidance-type project (safe water and efficient cookstoves displacing firewood) with no reversal events and a reasonable zero-leakage justification. However, the project is burdened by an extensive catalogue of material findings, non-compliance with methodology monitoring requirements, suspended issuance, and multiple unresolved contradictions across documents — particularly on additionality verification status and crediting period dates — that significantly undermine confidence in the integrity and reliability of the credit claims.
Red Flags
- Additionality verification status is directly contradicted: the 2023 verification report confirms VVB verification, while the 2024 validation report records it as not verified — the more recent document undermines the additionality claim
- Crediting period dates are inconsistent between the 2025 verification report (2020-02-25 to 2028-03-02) and the 2025 validation report (2025-02-05 to 2030-02-04), raising questions about which period is authoritative
- Project is in non-compliance with methodology requirements for parameter SDWS 23 (monitored quantity of safe water); deviation requests were not approved and issuance is suspended for periods of non-compliance
- Extensive list of material findings spanning multiple verification cycles, including incorrect baseline estimates, inconsistent parameter units, missing supporting documents, and geo-coordinate errors
- Water quality testing frequency was changed from quarterly to annually without adequate justification against methodology requirements
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test present but VVB verification contradicted by 2024 validation report
mixed evidence / unresolved risk
0% deduction justified as negligible for water/cookstove displacement
Project-specific baseline, reassessed 2024, but fNRB method contradicted across reports
FPIC conducted, grievance mechanism present, safeguards documented
CORSIA eligibility and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →