Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS7591 VPA 9 Northern Uganda Safe Water Project

GS-2209 ↗ · current registry ID: GS7594

#1079of 1329 in Industrial#136of 163 in Uganda#1521of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
3.8
Claim Safety
4.8
Documentation
3.2

Audit Analysis

The Northern Uganda Safe Water Project is a fundamentally sound avoidance-type project (safe water and efficient cookstoves displacing firewood) with no reversal events and a reasonable zero-leakage justification. However, the project is burdened by an extensive catalogue of material findings, non-compliance with methodology monitoring requirements, suspended issuance, and multiple unresolved contradictions across documents — particularly on additionality verification status and crediting period dates — that significantly undermine confidence in the integrity and reliability of the credit claims.

Red Flags

  • Additionality verification status is directly contradicted: the 2023 verification report confirms VVB verification, while the 2024 validation report records it as not verified — the more recent document undermines the additionality claim
  • Crediting period dates are inconsistent between the 2025 verification report (2020-02-25 to 2028-03-02) and the 2025 validation report (2025-02-05 to 2030-02-04), raising questions about which period is authoritative
  • Project is in non-compliance with methodology requirements for parameter SDWS 23 (monitored quantity of safe water); deviation requests were not approved and issuance is suspended for periods of non-compliance
  • Extensive list of material findings spanning multiple verification cycles, including incorrect baseline estimates, inconsistent parameter units, missing supporting documents, and geo-coordinate errors
  • Water quality testing frequency was changed from quarterly to annually without adequate justification against methodology requirements

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Combined test present but VVB verification contradicted by 2024 validation report

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction justified as negligible for water/cookstove displacement

Baseline

Project-specific baseline, reassessed 2024, but fNRB method contradicted across reports

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented

Double-claim

CORSIA eligibility and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents