Guangdong Taishan Xiachuandao Wind Farm Project
#845of 1935 in Renewable energy#433of 1084 in China#596of 1459 in CDM (UNFCCC)#658of 1287 in ACM0002
Audit Analysis
A CDM wind generation project in China with a jurisdictional baseline (grid emission factor of 0.689425 tCO₂/MWh, 2017) and a 7-year crediting period. The project shows no material findings, no corrective actions, and a reasonable leakage treatment, but the extracted record lacks explicit additionality test details, monitoring period data, and buffer pool information, creating moderate evidence gaps.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record despite the validation report being present in the evidence set
- Total ERR claimed and verified are identical (370,825), which may indicate the monitoring report was not separately extracted or the figures were not independently verified for a specific period
- No buffer pool percentage or reversal event data found, leaving permanence safeguards undocumented for the crediting period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 389,173 | 0 | 389,173 | |
| Total | 389,173 | 0 | 389,173 |
Risk Indicators
Test type not stated in extracted record
Wind generation – no inherent reversal risk
Deemed negligible – consistent with wind-to-grid
Jurisdictional, grid EF 0.689, reassessed 2020
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →