Skip to main content
CDMWindChinaACM0002

Guangdong Taishan Xiachuandao Wind Farm Project

CDM-5179 ↗

#845of 1935 in Renewable energy#433of 1084 in China#596of 1459 in CDM (UNFCCC)#658of 1287 in ACM0002

5.3/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A CDM wind generation project in China with a jurisdictional baseline (grid emission factor of 0.689425 tCO₂/MWh, 2017) and a 7-year crediting period. The project shows no material findings, no corrective actions, and a reasonable leakage treatment, but the extracted record lacks explicit additionality test details, monitoring period data, and buffer pool information, creating moderate evidence gaps.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record despite the validation report being present in the evidence set
  • Total ERR claimed and verified are identical (370,825), which may indicate the monitoring report was not separately extracted or the figures were not independently verified for a specific period
  • No buffer pool percentage or reversal event data found, leaving permanence safeguards undocumented for the crediting period

Credit Vintages

IssuedRetiredAvailable
2022
389,1730389,173
Total389,1730389,173

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Wind generation – no inherent reversal risk

Leakage

Deemed negligible – consistent with wind-to-grid

Baseline

Jurisdictional, grid EF 0.689, reassessed 2020

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.