Guangxi Youjiang Naji Navigation and Power Generation Project
#951of 1084 in China#1262of 1459 in CDM (UNFCCC)#1150of 1287 in ACM0002
Audit Analysis
A CDM hydro power project with a jurisdictional baseline and inherently low permanence risk, but significant documentation gaps including no monitoring reports, an unverified additionality assessment, and a seven-fold discrepancy between the PDD and validation report on total emissions reductions. The project's crediting period has expired (March 2023) with no verified performance data available to confirm actual delivery.
Red Flags
- Total ERR differs by a factor of ~7 between the PDD (909,433 tCO2e) and the validation report (129,919 tCO2e), indicating a major error in the project developer's original calculation
- No monitoring reports or verified emissions reductions are available in the extracted record, making it impossible to confirm actual credit delivery
- Additionality test type and VVB confirmation are not stated in any available document
- Three material findings (CARs) were raised during validation, including a correction to the hydro reservoir emissions assessment standard from 4 W/m² to 10 W/m²
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 270,083 | 0 | 270,083 | |
| 2012 | 120,699 | 0 | 120,699 | |
| 2013 | 140,566 | 0 | 140,566 | |
| Total | 531,348 | 0 | 531,348 |
Risk Indicators
Test type and VVB confirmation not stated in available docum
Hydro project — no carbon stock, no reversal risk
Deemed negligible, 0% deduction — reasonable for grid displa
Jurisdictional per VVB but contradicted by appendix; grid EF
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →