Guazhou Daliang North 47.5 MW large scale wind turbine wind farm project
#498of 1935 in Renewable energy#204of 1084 in China#325of 1459 in CDM (UNFCCC)#373of 1287 in ACM0002
Audit Analysis
A 47.5 MW onshore wind project in China validated under CDM methodology ACM0002 v20.0, using a jurisdictional grid emission factor baseline. The project presents a low inherent risk profile typical of wind, with no material findings or corrective actions, but the extracted record lacks explicit additionality test details, monitoring period data, and CORSIA/CCP eligibility status, leaving moderate evidence gaps.
Red Flags
- Additionality test type and VVB confirmation are not explicitly stated in the extracted record, creating an evidence gap despite the project having been validated by CTC
- Monitoring period is not stated in any available document, making it impossible to independently verify the 577,304 tCO2e figure against a defined reporting window
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not explicitly stated in record
Avoidance project, no reversal risk
Negligible, consistent with wind
Jurisdictional grid EF, reassessed 2020
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →