Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Mining/mineral productionChina Registry: RegisteredACM0008

Guizhou Jinyan CMM Power Generation Project

VCS-2895 ↗

#129of 189 in Methane#926of 1084 in China#1066of 1339 in Verra (VCS)#23of 35 in ACM0008

4.3/ 10
Integrity
2.5
Transparency
5.5
Claim Safety
5.2
Documentation
4.8

Audit Analysis

The Guizhou Jinyan CMM Power Generation Project is a VCS-registered coal mine methane capture project verified by Tuev Nord, with VVB-confirmed additionality and legally mandated capture. However, the verification report identified 13 material findings including an inaccurate emission reduction calculation, and the project delivered only ~63% of its pro-rata ex-ante expectation for the first monitoring period. Contradictions between the PDD, validation report, and monitoring report on baseline type, leakage justification, and additionality test type reduce confidence in the underlying data.

Red Flags

  • Corrective action for 'inaccurate emission reduction calculation' identified by the VVB in the verification report (Dec 2022) — a direct challenge to the integrity of the claimed 126,134 tCO₂e
  • 13 material findings (CL 01–06, CAR 01–07) in the verification report, including missing stakeholder consultation records, unclear metering descriptions, and incomplete monitoring parameter cross-checks
  • Reversal events explicitly 'not addressed' in the extracted record and no buffer pool percentage stated — permanence risk for a CMM project is unquantified
  • Contradiction between the monitoring report (baseline 'measured') and the validation report (baseline 'modeled') undermines confidence in the baseline methodology
  • Leakage justification is inconsistent: the monitoring report states it was 'quantified' while the validation report states it was 'deemed negligible', yet both yield a 0% deduction
  • Gas capture legally mandated — additionality in doubt

Credit Vintages Exhausted

IssuedRetiredAvailable
2021
104,873104,8730
Total104,873104,8730

Risk Indicators

Additionality

VVB-confirmed investment test; capture legally required

Permanence

Reversal events not addressed

Leakage

0% deduction; justification contradicts between documents

Baseline

Project-specific; measured vs modeled contradiction

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated; dual-channel risk unconfirmed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0008

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents