Guizhou Shuicheng Jinshizi Hydropower Station
#112of 1935 in Renewable energy#27of 1084 in China#64of 1459 in CDM (UNFCCC)#79of 1287 in ACM0002
Audit Analysis
A small-scale hydropower CDM project in China with a VVB-confirmed investment additionality test, jurisdictional baseline, and no reported reversal events or material compliance issues. The project is well-documented across 15 sources with high extraction confidence, though several transparency fields (FN/RB method, usage monitoring) are not stated in the extracted record. Minor contradictions between the PDD and validation/monitoring reports were resolved in favour of the more authoritative VVB documents.
Red Flags
- Grid emission factor of 0.761689 is based on 2004 data, which predates the 2008 project start by four years; no updated grid EF is recorded in the extracted documents
- Two monitoring reports show different claimed ER figures (53,501 in 2011 vs 36,029 in 2012), which, while likely reflecting different periods, could indicate inconsistent reporting methodology
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 80,414 | 0 | 80,414 | |
| 2011 | 71,340 | 0 | 71,340 | |
| 2012 | 89,529 | 0 | 89,529 | |
| Total | 241,283 | 0 | 241,283 |
Risk Indicators
VVB-confirmed investment test
Fixed infrastructure, no reversal risk
Negligible, appropriate for hydro
Jurisdictional, CDM-standard
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →