Gujarat Narmada Valley Fertilizer Company (GNFC) Nitrous Oxide Abatement Project
#8of 189 in Methane#91of 975 in India#109of 1459 in CDM (UNFCCC)
Audit Analysis
The GNFC N2O abatement project demonstrates solid additionality through a VVB-confirmed combined test and a measured, project-specific baseline appropriate for a closed-process abatement methodology. However, transparency is limited by the absence of a verified ERR figure, only ~2.5 months of monitoring data, and several key MRV fields not stated in available documents. The project carries moderate claim-safety risk primarily due to the project-specific baseline and a minor documentation inconsistency on leakage treatment between the validation and monitoring reports.
Red Flags
- Validation report (2009) does not address leakage at all, while the monitoring report (2010) states it is 'deemed negligible' — the initial validation gap weakens the evidentiary chain for the 0% deduction
- No verified ERR figure is available in the extracted record; only the claimed 82,024 tCO2e for the first monitoring period is documented, making independent over-crediting assessment impossible
- Only approximately 2.5 months of monitoring data (Oct 2009 – Jan 2010) is available against a 10-year crediting period, leaving the long-term performance trajectory unverified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 41,493 | 0 | 41,493 | |
| Total | 41,493 | 0 | 41,493 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, validation gap
Project-specific, measured
Mentioned, FPIC/grievance not stated
CCP/CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →