Guodian Huachuan Zhongfu Wind Farm Project
#90of 1935 in Renewable energy#18of 1084 in China#53of 1459 in CDM (UNFCCC)#58of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with solid additionality (combined test confirmed by TÜV Rheinland, IRR below benchmark) and a standard jurisdictional grid-emission-factor baseline. The project delivered substantially more credits than the pro-rata expectation for the monitoring period, suggesting a conservative baseline, but an internal contradiction in the claimed ERR figures within the same monitoring report raises a data-reliability question. No permanence or leakage concerns apply to this avoidance-type wind project.
Red Flags
- The monitoring report (2015) contains two different 'claimed' ERR values (172,236 and 35,889) for the same project, creating ambiguity about the correct ex-ante expectation for the monitoring period.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
- The grid emission factor of 1.1438 tCO₂/MWh is anchored to 2008 data; no evidence of periodic grid-EF updates was found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 174,940 | 0 | 174,940 | |
| Total | 174,940 | 0 | 174,940 |
Risk Indicators
Combined test, VVB-confirmed, IRR below benchmark
Avoidance project, no reversal risk
0% deduction, negligible per ACM0002
Jurisdictional grid EF, standard for wind
Safeguards mentioned, benefit sharing described; FPIC and gr
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →