Guodian Jingbian Jishanliang Phase III 49.5MW Wind Farm Project
#616of 1935 in Renewable energy#293of 1084 in China#421of 1459 in CDM (UNFCCC)#472of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China validated under CDM methodology ACM0002, with additionality confirmed by the VVB via a combined test. The project delivered approximately 99.5% of its pro-rata ex-ante expectation for the monitoring period, but the record is marred by five inter-document contradictions, over twenty material findings, and three outstanding corrective actions that collectively weaken confidence in the underlying data.
Red Flags
- Five contradictions across documents, including baseline method (project vs jurisdictional), crediting period dates, and total ERR figures, indicating inconsistent record-keeping
- Twenty material findings (3 corrective actions + 17 clarifications) in the validation report, with 3 CARs still requiring resolution
- No independently verified ERR figure available; only the project's claimed figure of 304,098 tCO2e is on record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 287,547 | 0 | 287,547 | |
| 2021 | 304,097 | 0 | 304,097 | |
| Total | 591,644 | 0 | 591,644 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, quantified justification
Method contradicts across documents
Mentioned but FPIC and grievance mechanism absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →