Skip to main content
CDMSolarChinaAMS-I.D

Guodian Ningxia Pingluo 10MWp Solar Photovoltaic Power Project

CDM-4982 ↗

#1109of 1935 in Renewable energy#621of 1084 in China#842of 1459 in CDM (UNFCCC)#361of 806 in AMS-I.D

5.0/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A 10 MWp solar PV project in Ningxia, China, registered under CDM with a confirmed investment-test additionality assessment by TÜV NORD CERT. The project's methodology (AMS-I.D) is standardised and the leakage treatment (deemed negligible) is appropriate for grid-displacement solar, but the project-specific baseline, 11 material findings at validation, and the complete absence of any verified monitoring data limit confidence in the claimed 97,573 tCO₂e.

Red Flags

  • Eleven material findings and eleven corrective actions were raised at validation, spanning IRR traceability, sensitivity analysis, VAT justification, and PDD inconsistencies — indicating a weak initial documentation package
  • No verified or monitored ERR data is available in the extracted record; the 97,573 tCO₂e figure is an ex-ante claim with no independent confirmation of actual generation
  • Baseline method is contradictory: the validation report characterises it as project-specific while the PDD references a jurisdictional approach, creating ambiguity about the counterfactual
  • No buffer pool, no permanence data, and no reversal-event record are present in the available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

low inherent risk for solar

Leakage

Deemed negligible; appropriate for grid-displacement solar

Baseline

Project-specific; contradicts PDD jurisdictional reference

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents