Guodian Ningxia Zhongwei 10MWp Solar Photovoltaic Power Project

CDM-5374 ↗

#686of 1935 in Renewable energy#331of 1084 in China#473of 1459 in CDM (UNFCCC)#242of 806 in AMS-I.D

5.5/ 10
Integrity
6.2
Transparency
4.8
Claim Safety
5.8
Documentation
4.2

Audit Analysis

A 10 MWp solar PV project under CDM with a standard investment-test additionality assessment confirmed by TÜV Nord and a jurisdictional grid-emission-factor baseline. The project's core design is sound for its type, but the record is thin on verified delivery data, safeguards detail, and monitoring evidence, and the validation report carried ten material findings including several corrective actions on financial and monitoring methodology.

Red Flags

  • Ten material findings in the validation report, including four corrective actions (CARs) on IRR calculation, sensitivity analysis, UK approval, and project start-date definition, yet the extracted record lists zero corrective actions as required — an internal inconsistency that undermines confidence in the validation outcome.
  • No verified emission-reduction figures, no monitoring period, and no verification reports were found in the extracted record, making it impossible to confirm whether the 97,636 tCO₂e lifetime claim was actually delivered.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal data; short 7-yr period

Leakage

Negligible, justified for PV

Baseline

Jurisdictional grid EF (2007)

Safeguards

Mentioned but no FPIC/grievance detail

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents