5.2/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A 49.5 MW onshore wind project registered under CDM with a standard jurisdictional grid-emission-factor baseline and a VVB-confirmed investment additionality test. The validation report (TÜV NORD CERT, December 2012) identified 12 material findings in the PDD, all of which were addressed through corrective actions before registration. However, no monitoring or verification reports are available in the extracted record, so actual emission reductions cannot be verified against the 644,427 tCO₂e ex-ante claim.

Red Flags

  • Twelve material findings were raised during validation, including missing GHG emission estimates, incomplete sensitivity analysis, and a meter-location mismatch with the actual site — all corrected before registration but indicative of a weak initial PDD
  • No monitoring reports or verification reports are present in the extracted record; the 644,427 tCO₂e lifetime claim cannot be cross-checked against any verified figure
  • The grid emission factor is anchored to 2011 data; no evidence of periodic grid-EF updates across the 2013–2019 crediting period is available

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – low reversal risk

Leakage

Deemed negligible, consistent with wind

Baseline

Jurisdictional grid EF, standard for wind

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents