Guodian Shuozhou Haifeng Hutoushan Phase I 49.5MW Windfarm Project
#379of 1084 in China#548of 1459 in CDM (UNFCCC)#598of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China validated under CDM methodology ACM0002 with a standard jurisdictional grid baseline and VVB-confirmed combined additionality test. The project carries inherent low permanence risk as an avoidance-type wind installation, but the absence of any monitoring-period data, a low extraction confidence rating, and ten material findings at validation (all subsequently resolved) limit confidence in the verified credit volume. No CORSIA or CCP eligibility is stated, and the grid emission factor dates to 2011 for a 2013–2019 crediting period.
Red Flags
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the structured record may be incomplete.
- No monitoring-period data or monitoring report appears in the extracted record; the claimed and verified ERR figures are identical (651,882), suggesting the verified figure is simply the validation-confirmed ex-ante estimate rather than an independently monitored result.
- Ten material findings were raised at validation, including a formula correction (CAR#8), IRR input justification (CL#5), and a combined-margin emission-factor discrepancy (CL#7), indicating the initial submission had technical gaps.
- The grid emission factor of 0.895875 tCO₂/MWh is dated 2011, while the crediting period runs 2013–2019; no baseline reassessment date is recorded.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, consistent with wind
Jurisdictional grid EF from 2011, no reassessment date
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →