Guodian Shuozhou Pinglu Hutoushan Wind Farm 249MW Project
#1372of 1935 in Renewable energy#833of 1084 in China#1107of 1459 in CDM (UNFCCC)#1059of 1287 in ACM0002
Audit Analysis
A 249 MW onshore wind project in China registered under CDM with a jurisdictional grid-emission-factor baseline and a VVB-confirmed combined additionality test. The design is sound for a wind project, but the available record contains no monitoring reports, no verified emission reductions, and only a validation report with seven (resolved) corrective-action requests, leaving permanence and actual performance unverified. Low extraction confidence and sparse documentation further limit confidence in the project's reported figures.
Red Flags
- No monitoring reports or verified emission-reduction figures are present in the extracted record, so actual performance against the 3,513,391 tCO₂e lifetime claim cannot be confirmed.
- Seven corrective-action requests in the validation report (inconsistent generator ratings, loan rates, stakeholder-consultation description, and project start date) indicate material documentation-quality issues in the PDD, although all were resolved before registration.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the structured data may be incomplete.
- No permanence-risk assessment, reversal-event history, or buffer-pool mechanism is documented, leaving the 7-year crediting-period permanence claim unverified.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
unverified
0% deemed negligible, reasonable for wind
Jurisdictional grid EF, standard for wind
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →