Guodian Tulufan Daheyan River Qushou and downstream Cascaded Hydropower Project
#1490of 1935 in Renewable energy#928of 1084 in China#1243of 1459 in CDM (UNFCCC)#1135of 1287 in ACM0002
Audit Analysis
A CDM cascaded hydropower project in China with a VVB-confirmed combined additionality test and a reasonable zero-leakage justification, but severely undermined by a seven-fold discrepancy in claimed emission reductions between the validation report and an appendix, a conflicting grid emission factor, and a baseline-method inconsistency between the PDD and validation report. No monitoring data, verified ERR, or permanence mechanism is available in the extracted record, leaving the project's actual performance and long-term integrity unassessable.
Red Flags
- Seven-fold discrepancy in total claimed ERR: 174,569 tCO₂e in the validation report versus 1,221,985 tCO₂e in an appendix — a factor-of-7 gap that cannot be reconciled from available documents
- Grid emission factor conflict: 0.7926 tCO₂/MWh (validation report, 2010 grid) versus 1.0001 tCO₂/MWh (appendix, undated) — a 27% difference that materially affects the credit quantity
- Baseline method stated as 'project-specific' in the validation report but 'jurisdictional' in the PDD, creating ambiguity about the counterfactual basis
- No monitoring report, verified ERR, or monitoring period found in any available document — actual performance is entirely unverified
- No permanence or reversal-risk mechanism (buffer pool, insurance, or equivalent) is documented for the 7-year crediting period
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deemed negligible, consistent with hydro
Project-specific per VVB, but PDD says jurisdictional
Safeguards mentioned, benefit-sharing described, but no FPIC
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →