Skip to main content
CDMWindChinaACM0002

Guodian Xinjiang Tacheng Mayitasi Phase I 49.5 MW Wind Power Project

CDM-7830 ↗

#1255of 1935 in Renewable energy#741of 1084 in China#982of 1459 in CDM (UNFCCC)#975of 1287 in ACM0002

4.8/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A 49.5 MW wind power project in Xinjiang, China, validated under CDM with a combined additionality test confirmed by DNV and a jurisdictional grid-emission-factor baseline. The project is methodologically sound for its sector, but the absence of any monitoring-period data, verified emission reductions, or permanence tracking leaves significant evidence gaps. Eight material findings at validation (including two corrective actions) and low extraction confidence further limit confidence in the record.

Red Flags

  • No monitoring-period data or verified emission reductions found in any available document — the project's 7-year crediting period (2013–2020) has ended yet no verification report is present
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
  • Eight material findings at validation, including two corrective actions (missing Letter of Approval and Modalities of Communications), suggest initial documentation gaps
  • No buffer pool, reversal-event tracking, or permanence mechanism documented for a project whose crediting period has already expired

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test confirmed by DNV

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible — appropriate for wind

Baseline

Jurisdictional grid EF (0.8963, 2012)

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents