Guohua Bayannaoer Wulate Houqi Wuliji Phase II 49.5MW Wind Farm Project
#851of 1935 in Renewable energy#439of 1084 in China#602of 1459 in CDM (UNFCCC)#664of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Inner Mongolia, China, validated under CDM methodology ACM0002 with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline. The project is inherently low-risk (avoidance-type, no reversal or feedstock concerns), but the extracted record contains no monitoring or verification reports, no MRV data, and was scored under low extraction confidence, limiting the ability to confirm actual performance against the 814,492 tCO₂e ex-ante estimate.
Red Flags
- No monitoring reports or verification reports found in the extracted record; actual emissions reductions for the 2013–2019 crediting period cannot be independently confirmed
- Low extraction confidence on key documents, reducing reliability of the structured data
- Free, Prior and Informed Consent (FPIC) and a grievance mechanism are not documented in the available record
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid EF (2012)
Safeguards mentioned, FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →