Guohua Binzhou Zhanhua 49.5MW Wind Farm Project (Phase 1)
#1492of 1935 in Renewable energy#930of 1084 in China#1245of 1459 in CDM (UNFCCC)#1137of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China registered under CDM with a jurisdictional baseline and a 7-year crediting period (2016–2023). The project is inherently low-risk in terms of permanence and leakage, but the extracted record is sparse: additionality test details, monitoring data, and verified emission reductions are absent, and the extraction confidence is flagged as low. A minor contradiction on leakage treatment between the PDD and the validation report was resolved in favour of the later validation report.
Red Flags
- Additionality test type and VVB confirmation of additionality are not stated in any available document, leaving a gap in the additionality evidence chain.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the extracted record may be incomplete.
- No monitoring report data (monitoring period, verified ERR, FNRB) was found in the extracted record, preventing any pro-rata delivery check.
- Contradiction between the PDD (leakage 'quantified') and the validation report (leakage 'deemed negligible') suggests inconsistent documentation of the leakage assessment.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 95,920 | 0 | 95,920 | |
| 2012 | 158,729 | 0 | 158,729 | |
| 2013 | 91,067 | 0 | 91,067 | |
| 2015 | 156,091 | 0 | 156,091 | |
| Total | 501,807 | 0 | 501,807 |
Risk Indicators
Test type not stated in record
Avoidance project, low reversal risk
0% deduction, negligible justification, minor doc contradict
Jurisdictional, reassessed 2016
Safeguards mentioned but details not extracted
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →