Skip to main content
CDMWindChinaACM0002

Guohua Dongying Hekou Phase III Wind Farm Project

CDM-6200 ↗

#1256of 1935 in Renewable energy#743of 1084 in China#984of 1459 in CDM (UNFCCC)#976of 1287 in ACM0002

4.8/ 10
Integrity
6.0
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A CDM wind project in China with a solid combined additionality test verified by Bureau Veritas and a jurisdictional grid baseline, but the available record is limited to validation-stage documents with no monitoring or verification reports for the full 2012–2019 crediting period. A significant 7× discrepancy between the PDD and validation report emission-reduction figures was corrected before registration, and the low extraction confidence further weakens confidence in the data. Overall, the project design is sound but the evidentiary record is thin.

Red Flags

  • The PDD (April 2012) claimed 736,631 tCO₂ while the validation report (May 2012) corrected this to 105,233 tCO₂ — a 7× over-claim that was flagged as 'not conservative' in the material findings and adjusted before registration.
  • No monitoring reports or verification reports are present in the extracted record for a project whose crediting period ran from June 2012 to May 2019, leaving actual performance entirely unverified.
  • Minimum extraction confidence is rated low, and one of the seven source documents is typed as 'unknown', reducing reliability of the extracted data.
  • No buffer pool, permanence mechanism, or reversal-risk assessment is documented for the project.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

mixed evidence / unresolved risk

Leakage

0% justified for wind

Baseline

Jurisdictional grid EF (2010)

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents