Guohua Dongying Hekou Phase IV Wind Farm Project
#1316of 1935 in Renewable energy#794of 1084 in China#1042of 1459 in CDM (UNFCCC)#1020of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a solid jurisdictional baseline and VVB-confirmed additionality, but severely limited by the absence of any monitoring or verification reports, a 7-fold discrepancy in claimed emissions reductions between the PDD and validation report, and low extraction confidence across the available documents. The project is past its crediting period with no post-validation evidence of actual delivery.
Red Flags
- Total ERR discrepancy of 7x between PDD (736,078 tCO2e) and validation report (105,154 tCO2e) — the VVB-verified figure is privileged but the magnitude of the gap undermines confidence in the project's quantification
- No monitoring report or verification report available; the project's 7-year crediting period (2012–2019) has ended with no evidence of actual emissions reductions delivered
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable, reducing reliability of all extracted facts
- No permanence mechanism (buffer pool, insurance, or reversal tracking) documented for a project whose crediting period has already expired
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
crediting period expired
0% deemed negligible, appropriate for wind
Jurisdictional grid EF (0.9309, 2010)
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →