Guohua Guyuan Bayuan 100MW Wind Farm Project
#957of 1935 in Renewable energy#508of 1084 in China#697of 1459 in CDM (UNFCCC)#751of 1287 in ACM0002
Audit Analysis
A 100 MW onshore wind farm in China validated under CDM methodology ACM0002 with a VVB-confirmed combined additionality test and a standard jurisdictional grid baseline. The project type carries inherently low permanence and leakage risk, but the available record is limited to the validation stage: no monitoring reports, no verified emission reductions, and a significant discrepancy between the PDD and validation report on total claimed reductions create material uncertainty about the actual credit volume.
Red Flags
- Total claimed emission reductions differ by a factor of ~7 between the PDD (1,389,094 tCO₂e) and the validation report (198,442 tCO₂e); the validation report figure is privileged as the later, authoritative document, but the discrepancy is unexplained and undermines confidence in the credit volume.
- No monitoring reports or verified emission-reduction figures are present in the extracted record, so actual performance against the ex-ante estimate cannot be assessed.
- The additionality test type is described as 'combined' in the validation report but as 'investment' in an earlier document (2012-06-26); the validation report is privileged, but the inconsistency suggests the PDD may have been drafted with a narrower test.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% justified as negligible
Jurisdictional grid EF (2011)
Mentioned; FPIC & grievance not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →