Skip to main content
CDMWindChinaACM0002

Guohua Hebei Huanghua 49.5 MW Wind Farm Project (Phase I)

CDM-2125 ↗

#1110of 1935 in Renewable energy#623of 1084 in China#844of 1459 in CDM (UNFCCC)#865of 1287 in ACM0002

5.0/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
6.5
Documentation
3.5

Audit Analysis

A 49.5 MW onshore wind project in Hebei, China, validated under CDM methodology ACM0002 with a jurisdictional baseline and a 7-year crediting period (2016–2023). The project is inherently low-risk in terms of permanence and leakage, but the available documentation is limited to the validation report and PDD, with no monitoring reports or verified emission reductions in the extracted record. A minor contradiction on leakage characterization and low extraction confidence temper the assessment.

Red Flags

  • No monitoring reports or verified emission reduction figures found in the extracted record despite the crediting period ending in October 2023
  • Low extraction confidence across the document set, with one source listed as 'unknown'
  • Additionality test type and VVB confirmation of additionality are not explicitly stated in the extracted data
  • No grievance mechanism or FPIC documentation found in the available records

Credit Vintages

IssuedRetiredAvailable
2010
74,051074,051
2011
90,664090,664
2012
85,075085,075
2013
37,282037,282
Total287,0720287,072

Risk Indicators

Additionality

Test type not explicitly stated in extracted record

Permanence

Wind project — no biogenic reversal risk

Leakage

0% deduction, deemed negligible — reasonable for wind

Baseline

Jurisdictional baseline, 2014 grid EF, reassessed 2016

Safeguards

Safeguards mentioned, benefit sharing described; no FPIC or

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents