Guohua Hebei Huanghua 49.5 MW Wind Farm Project (Phase I)
#1110of 1935 in Renewable energy#623of 1084 in China#844of 1459 in CDM (UNFCCC)#865of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Hebei, China, validated under CDM methodology ACM0002 with a jurisdictional baseline and a 7-year crediting period (2016–2023). The project is inherently low-risk in terms of permanence and leakage, but the available documentation is limited to the validation report and PDD, with no monitoring reports or verified emission reductions in the extracted record. A minor contradiction on leakage characterization and low extraction confidence temper the assessment.
Red Flags
- No monitoring reports or verified emission reduction figures found in the extracted record despite the crediting period ending in October 2023
- Low extraction confidence across the document set, with one source listed as 'unknown'
- Additionality test type and VVB confirmation of additionality are not explicitly stated in the extracted data
- No grievance mechanism or FPIC documentation found in the available records
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 74,051 | 0 | 74,051 | |
| 2011 | 90,664 | 0 | 90,664 | |
| 2012 | 85,075 | 0 | 85,075 | |
| 2013 | 37,282 | 0 | 37,282 | |
| Total | 287,072 | 0 | 287,072 |
Risk Indicators
Test type not explicitly stated in extracted record
Wind project — no biogenic reversal risk
0% deduction, deemed negligible — reasonable for wind
Jurisdictional baseline, 2014 grid EF, reassessed 2016
Safeguards mentioned, benefit sharing described; no FPIC or
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →