Guohua Jiaonan Wind Power Generation First Phase Project
#91of 1935 in Renewable energy#19of 1084 in China#54of 1459 in CDM (UNFCCC)#59of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a well-established additionality case (combined test confirmed by the VVB) and a standard grid-emission-factor baseline. The project is a low-risk avoidance-type credit with no inherent reversal risk, though several documentation gaps (missing crediting-period end date, no buffer pool figure, no FPIC or grievance mechanism record) and four inter-document contradictions temper confidence. Overall a solid, conservative credit with minor transparency shortcomings.
Red Flags
- Four contradictions between the validation report (2012) and monitoring report (2014) on leakage justification, additionality test type, ERR figures, and baseline method reduce data reliability
- Crediting period end date is not stated in any available document, making the full ex-ante estimate period uncertain
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 139,165 | 0 | 139,165 | |
| Total | 139,165 | 0 | 139,165 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance type, no reversal risk
0% deduction, quantified, appropriate for wind
Grid EF baseline, minor doc contradiction
Mentioned, benefit sharing described, no FPIC/grievance reco
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →