Guohua Rongcheng Phase IV Wind Farm Project
#688of 1935 in Renewable energy#333of 1084 in China#475of 1459 in CDM (UNFCCC)#531of 1287 in ACM0002
Audit Analysis
A CDM wind avoidance project with a solid combined additionality test confirmed by SGS UK and a jurisdictional baseline, but the available record is limited to validation-stage documents with low extraction confidence. The leakage justification shows a minor contradiction between the PDD and validation report, and several key monitoring and verification fields are absent, limiting confidence in actual performance delivery.
Red Flags
- Leakage justification contradicts between the PDD (quantified) and the validation report (deemed negligible); the 0% deduction rests on the weaker justification
- Minimum extraction confidence is low, indicating at least one key document was poorly readable, reducing reliability of all extracted facts
- No monitoring-period data, FNRB value, or usage-rate verification found in the extracted record, preventing assessment of actual vs. claimed emissions reductions
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deduction, justification contradicted
Jurisdictional, standardised
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →