Guohua Shenmu Dunliang Wind Farm Project
#1374of 1935 in Renewable energy#835of 1084 in China#1109of 1459 in CDM (UNFCCC)#1061of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind farm in China validated under CDM methodology ACM0002 with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The project is inherently low-risk (avoidance-type, no reversal exposure), but the validation report carries 14 material findings and three cross-document contradictions—including a seven-fold discrepancy in the claimed emission reduction—significantly undermining confidence in the data. No monitoring or verification reports are available, leaving the project's actual performance unverified.
Red Flags
- Seven-fold discrepancy in total claimed emissions reductions: the PDD states 590,478 tCO₂ while the validation report states 84,354 tCO₂ for the same 7-year crediting period (2013–2019); the VVB figure is privileged but the gap is unexplained
- 14 material findings and corrective actions in the validation report, including incomplete demonstration that static investment would not decrease (CAR7) and a common-practice analysis not fully aligned with the CDM additionality tool (CAR8)
- No monitoring or verification reports are present in the extracted record; total verified emissions reductions are not stated, so actual delivery cannot be assessed
- Additionality test type is inconsistent between documents: the PDD describes a 'combined' test while the validation report records an 'investment' test
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but with material findings on investment test
Avoidance project – no reversal risk
0% deduction, justified as negligible for wind
Jurisdictional grid EF (0.8964, 2011)
Safeguards mentioned; FPIC and grievance mechanism not detai
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →