Guohua Zhucheng Wind Farm Project (Phase I)
#440of 1935 in Renewable energy#173of 1084 in China#285of 1459 in CDM (UNFCCC)#328of 1287 in ACM0002
Audit Analysis
A CDM wind project in China with VVB-confirmed additionality and a standard grid-emission-factor baseline, but undermined by a 55% discrepancy in claimed emissions reductions between the validation and monitoring reports, conflicting leakage justifications, and a baseline-method contradiction. The project is an avoidance-type wind installation with inherently low reversal risk, yet the absence of verified ERR figures and multiple null fields limit confidence in the actual credit volume.
Red Flags
- Claimed ERR of 132,450 tCO2e in the monitoring report (2014) is 55% higher than the 85,567 tCO2e in the validation report (2012); without a verified ERR figure the true delivery cannot be confirmed
- Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction that affects the credibility of the baseline
- Leakage justification is 'quantified' in the monitoring report but 'deemed negligible' in the validation report, while the deduction is 0% in both — the basis for the zero deduction is inconsistent
- Five corrective actions were required at validation (DNA approval letter, title consistency, timeline, baseline EF calculation, IRR sheet), indicating the PDD had material errors before registration
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 132,450 | 0 | 132,450 | |
| Total | 132,450 | 0 | 132,450 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, conflicting justifications
Grid EF standard, method contradicts between docs
Safeguards and benefit sharing mentioned, FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →