Gutanhe 10 MW Hydropower Project in Yunnan Province
#219of 1935 in Renewable energy#73of 1084 in China#133of 1459 in CDM (UNFCCC)#80of 806 in AMS-I.D
Audit Analysis
A small (10 MW) run-of-river hydropower project in Yunnan, China, registered under CDM using the simplified AMS-I.D methodology. Additionality is confirmed by a reputable VVB via an investment test, and the avoidance-based design carries no meaningful reversal risk. The main concerns are a set of four cross-document contradictions (baseline method, crediting period, leakage justification, and cumulative ERR), the absence of a verified ERR figure, and the use of a 2007 national grid emission factor in a hydro-rich province.
Red Flags
- Four contradictions between the validation report (2010) and the 2014 monitoring report on baseline method, crediting period, leakage justification, and cumulative ERR figures reduce confidence in data consistency
- Verified ERR figure is not stated in the extracted record, preventing independent confirmation of actual delivery against the 41,219 tCO₂e lifetime claim
- Grid emission factor of 0.84335 tCO₂/MWh (2007 national average) may overstate reductions for Yunnan Province, which has a significantly lower provincial grid factor due to its hydro-heavy generation mix
- Eleven corrective actions were required at validation, including revisions to the crediting period start date and emission reduction figures, indicating the original PDD contained material errors
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 24,396 | 0 | 24,396 | |
| 2013 | 23,205 | 0 | 23,205 | |
| 2015 | 41,205 | 0 | 41,205 | |
| Total | 88,806 | 0 | 88,806 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justified for grid-displacing hydro
National grid EF, method label contradictory across docs
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →