Gwangju metropolitan city sanitary landfill LFG power plant CDM project
#42of 189 in Methane#10of 24 in South Korea#605of 1459 in CDM (UNFCCC)#10of 34 in AMS-III.G
Audit Analysis
A 10-year CDM landfill gas project in South Korea with VVB-confirmed additionality via an investment test, but undermined by a contradiction between the PDD and validation report on whether gas capture was legally required. Numerous material findings (12 corrective action requests) were identified and resolved, and the project-specific modeled baseline with a 0% leakage deduction is reasonable for LFG but lacks independent verification of the verified ERR figure.
Red Flags
- Contradiction between the PDD (2015) stating capture is legally required and the validation report (2011) stating it is not — if the PDD is correct, additionality is fundamentally undermined
- Nine material findings including incorrect equipment specifications, wrong units in the monitoring plan, and an investment analysis period mismatch (20 vs 15 years) indicate weak initial documentation quality
- Verified ERR figure is not present in the extracted record, preventing independent cross-check of claimed credits
- Grid emission factor of 0.6018 tCO2/MWh is dated to 2008, predating the crediting period start in 2011
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 152,876 | 0 | 152,876 | |
| 2017 | 51,742 | 0 | 51,742 | |
| 2018 | 36,638 | 0 | 36,638 | |
| 2019 | 19,821 | 0 | 19,821 | |
| 2020 | 18,305 | 0 | 18,305 | |
| 2021 | 38,699 | 0 | 38,699 | |
| Total | 318,081 | 0 | 318,081 |
Risk Indicators
VVB-confirmed but legal-requirement contradiction
LFG consumed on-site, no reversal risk
0% deduction, quantified justification
Project-specific modeled baseline, no reassessment date
Safeguards and benefit sharing mentioned, FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →