Hadebute Hydropower Project in Fuyun County Xinjiang Uygur Autonomous Region, China
#690of 1935 in Renewable energy#337of 1084 in China#478of 1459 in CDM (UNFCCC)#533of 1287 in ACM0002
Audit Analysis
The Hadebute Hydropower Project is a small-scale CDM hydro project in Xinjiang, China, with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. However, the available record is limited to the validation stage (2012), with no monitoring reports, no buffer pool information, and a significant discrepancy between the PDD's claimed emissions reductions (3.34 MtCO₂e) and the VVB-verified figure (476 ktCO₂e). The project's crediting period ended in April 2020, and the absence of post-validation data limits confidence in actual delivery.
Red Flags
- Major ERR discrepancy: the PDD (Oct 2012) claims 3,334,352 tCO₂e while the validation report (Nov 2012) confirms only 476,336 tCO₂e — a factor of ~7 difference that raises questions about the PDD's accuracy
- No monitoring reports found in the extracted record despite the crediting period (2013–2020) having fully elapsed, leaving actual delivery unverified
- CORSIA eligibility and CCP status not stated, leaving double-claiming risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
low inherent reversal risk for hydro
0% deduction, deemed negligible — reasonable for hydro
Jurisdictional grid EF (0.7926, 2011)
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →