Skip to main content
CDMHydroChinaACM0002

Hadebute Hydropower Project in Fuyun County Xinjiang Uygur Autonomous Region, China

CDM-8421 ↗

#690of 1935 in Renewable energy#337of 1084 in China#478of 1459 in CDM (UNFCCC)#533of 1287 in ACM0002

5.5/ 10
Integrity
6.5
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Hadebute Hydropower Project is a small-scale CDM hydro project in Xinjiang, China, with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. However, the available record is limited to the validation stage (2012), with no monitoring reports, no buffer pool information, and a significant discrepancy between the PDD's claimed emissions reductions (3.34 MtCO₂e) and the VVB-verified figure (476 ktCO₂e). The project's crediting period ended in April 2020, and the absence of post-validation data limits confidence in actual delivery.

Red Flags

  • Major ERR discrepancy: the PDD (Oct 2012) claims 3,334,352 tCO₂e while the validation report (Nov 2012) confirms only 476,336 tCO₂e — a factor of ~7 difference that raises questions about the PDD's accuracy
  • No monitoring reports found in the extracted record despite the crediting period (2013–2020) having fully elapsed, leaving actual delivery unverified
  • CORSIA eligibility and CCP status not stated, leaving double-claiming risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

low inherent reversal risk for hydro

Leakage

0% deduction, deemed negligible — reasonable for hydro

Baseline

Jurisdictional grid EF (0.7926, 2011)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents