Hagita POME Methane Avoidance project_NBPOL-P2
#849of 1459 in CDM (UNFCCC)#21of 55 in AMS-III.H
Audit Analysis
A CDM methane-avoidance project in Papua New Guinea with VVB-confirmed additionality and a measured project-specific baseline, but the extracted record contains no monitoring-period data whatsoever, leaving the 449,976 tCO₂e lifetime claim entirely unverified. Seventeen material findings at validation (all subsequently resolved) and the absence of any permanence or buffer mechanism for a methane-avoidance activity introduce moderate integrity risk.
Red Flags
- No monitoring report or verified ERR figure found in any available document — the 449,976 tCO₂e lifetime claim is entirely unverified against actual performance.
- Seventeen material findings (CARs/CLs) were raised at validation, including inconsistencies in COD values, missing GHG source inventories, and a non-conforming additionality demonstration for AMS-III.H; all were resolved but the volume signals a weak initial PDD.
- No buffer pool, permanence mechanism, or reversal-risk mitigation is stated for a methane-avoidance project where treatment-system failure would reverse credits.
- Leakage deduction is 0% on the basis of 'deemed negligible' with no quantified analysis in the extracted record.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
mixed evidence / unresolved risk
0% deemed negligible, no quantified analysis
Project-specific, measured, no reassessment data
Safeguards mentioned, benefit-sharing described, FPIC/grieva
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →