Skip to main content
CDMMethane avoidancePapua New GuineaAMS-III.H

Hagita POME Methane Avoidance project_NBPOL-P2

CDM-7454 ↗

#849of 1459 in CDM (UNFCCC)#21of 55 in AMS-III.H

5.0/ 10
Integrity
6.0
Transparency
3.8
Claim Safety
5.0
Documentation
4.8

Audit Analysis

A CDM methane-avoidance project in Papua New Guinea with VVB-confirmed additionality and a measured project-specific baseline, but the extracted record contains no monitoring-period data whatsoever, leaving the 449,976 tCO₂e lifetime claim entirely unverified. Seventeen material findings at validation (all subsequently resolved) and the absence of any permanence or buffer mechanism for a methane-avoidance activity introduce moderate integrity risk.

Red Flags

  • No monitoring report or verified ERR figure found in any available document — the 449,976 tCO₂e lifetime claim is entirely unverified against actual performance.
  • Seventeen material findings (CARs/CLs) were raised at validation, including inconsistencies in COD values, missing GHG source inventories, and a non-conforming additionality demonstration for AMS-III.H; all were resolved but the volume signals a weak initial PDD.
  • No buffer pool, permanence mechanism, or reversal-risk mitigation is stated for a methane-avoidance project where treatment-system failure would reverse credits.
  • Leakage deduction is 0% on the basis of 'deemed negligible' with no quantified analysis in the extracted record.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, no quantified analysis

Baseline

Project-specific, measured, no reassessment data

Safeguards

Safeguards mentioned, benefit-sharing described, FPIC/grieva

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-III.H, AMS-I.D, AMS-I.A

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents