Hainan Dongfang Gaopai Phase I Wind Power Project
#854of 1935 in Renewable energy#442of 1084 in China#606of 1459 in CDM (UNFCCC)#667of 1287 in ACM0002
Audit Analysis
A CDM-era wind power project in Hainan, China, with a verified combined additionality test and a jurisdictional baseline, but with significant gaps in monitoring data, permanence evidence, and safeguards documentation. The ERR figures in the PDD and validation report are consistent on a pro-rata basis (annual vs. lifetime), and the 0% leakage deduction is reasonable for grid-displacing wind. The absence of any verified monitoring results, buffer pool, or reversal-risk data limits confidence in the project's long-term integrity.
Red Flags
- No monitoring period or verified ERR figures found in any available document — the project's actual delivery is unconfirmed
- No buffer pool, permanence mechanism, or reversal-risk assessment documented for a 7-year crediting period
- FPIC and grievance mechanism not documented despite safeguards being mentioned in the validation report
- Two material findings at validation (site coordinates and IRR calculation) required corrective action, indicating minor but real documentation weaknesses
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% justified for grid-displacing wind
Jurisdictional grid EF (2011)
Mentioned but FPIC/grievance undocumented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →