Hainan Nanzhonghe IV Small-Scale Hydropower Project
#1429of 1935 in Renewable energy#877of 1084 in China#1167of 1459 in CDM (UNFCCC)#469of 806 in AMS-I.D
Audit Analysis
A small-scale CDM hydropower project in Hainan, China, with a standard jurisdictional baseline and VVB-confirmed investment additionality, but significant data gaps including no monitoring reports, a seven-fold discrepancy in claimed emissions reductions between the PDD and validation report, and no buffer pool. The project's crediting period (2013–2019) has expired, and the low extraction confidence across seven documents limits the reliability of the available evidence.
Red Flags
- Seven-fold discrepancy in total claimed emissions reductions: the PDD (Sep 2012) states 85,449 tCO₂e while the validation report (Oct 2012) states 12,207 tCO₂e — the ratio of exactly 7× matches the crediting period length, suggesting one figure is annual and the other is the period total, but both are labelled 'total' in their respective documents
- No buffer pool or permanence mechanism is documented, and no reversal events data is available to confirm the absence of reversals
- Twelve corrective actions and material findings were raised during validation, including inconsistent input values between the PDD and the Preliminary Design Report, and missing Letters of Approval from both the Chinese and UK DNAs
- No monitoring reports or verified emissions reduction figures are available in the extracted record, making it impossible to confirm actual delivery against the claimed baseline
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
no reversal data
0% deemed negligible (hydro)
Jurisdictional grid EF (0.6323)
Mentioned; benefit sharing noted; no FPIC or grievance detai
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →