Hami Tianrun Shisanjianfang Wind Farm Phase II 49.5MW Wind Project

CDM-7407 ↗

#772of 1935 in Renewable energy#383of 1084 in China#551of 1459 in CDM (UNFCCC)#601of 1287 in ACM0002

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A 49.5 MW CDM wind project in China with VVB-confirmed additionality and a jurisdictional grid baseline, but undermined by 11 material findings at validation (including calculation errors in the emission factor and facility energy), contradictory leakage and baseline characterisations across documents, and absent safeguards documentation (no FPIC or grievance mechanism). Pro-rata delivery of ~82% of the expected credits for the elapsed monitoring period is reasonable for wind variability, but the documentation quality issues and missing safeguards lower confidence in the overall claim.

Red Flags

  • Eleven material findings at validation, including calculation errors in the facility energy (CAR B6) and emission factor sheet (CAR B7), raise concerns about the accuracy of the ex-ante credit estimate
  • Leakage justification is contradictory: the validation report (2012) states 'deemed negligible' while the monitoring report (2015) records 'not addressed', leaving the 0% deduction without a consistent, documented rationale
  • Baseline method is characterised as 'jurisdictional' in the PDD but 'project' in the monitoring report, creating ambiguity about whether the grid emission factor or a project-specific baseline applies
  • No FPIC, grievance mechanism, or stakeholder identification process is documented, despite the validation finding (CL E1) that stakeholder identification was not demonstrated
  • Grid emission factor of 0.89635 is dated 2011, two years before the crediting period start in January 2013, with no evidence of an updated factor

Credit Vintages

IssuedRetiredAvailable
2015
189,3680189,368
Total189,3680189,368

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Jurisdictional grid EF, method label contradictory

Safeguards

Mentioned but no FPIC or grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents