Handan LFG Power Generation Project
#50of 189 in Methane#512of 1084 in China#701of 1459 in CDM (UNFCCC)#45of 159 in ACM0001
Audit Analysis
The Handan LFG Power Generation Project is a CDM landfill gas project with a confirmed investment additionality test and no reported reversal events, but it carries moderate risk due to a project-specific modeled baseline, a 0% leakage deduction with inconsistent justification across documents, and a notable discrepancy between the ex-ante ERR estimate (739,977) and the monitoring report figure (592,004). No verified ERR figure is available in the extracted record, limiting the ability to confirm actual delivery against expectations.
Red Flags
- ERR discrepancy: the validation report estimates 739,977 tCO2e over the crediting period while the 2023 monitoring report states 592,004 — a ~20% gap that is not explained in the extracted record
- Leakage deduction of 0% with justification described as 'not addressed' in the monitoring report, contradicting the validation report's 'deemed negligible' statement
- No buffer pool or permanence mechanism is documented (CDM project), leaving no financial backstop against potential reversal
- Total verified ERR is not stated in any available document, preventing independent confirmation of actual credit issuance
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
no reversals reported
0% deduction; justification inconsistent
Project-specific, modeled; no reassessment data
Safeguards mentioned; FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →