Hangtian Wanyuan Gaizhou Tazigou Wind Farm Project
#1496of 1935 in Renewable energy#934of 1084 in China#1250of 1459 in CDM (UNFCCC)#1142of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with VVB-confirmed additionality and a reasonable zero-leakage assumption, but undermined by seven corrective action requests during validation, a project-specific baseline, and a complete absence of monitoring or verification data. The project's crediting period ended in 2019, and no post-validation evidence of actual delivery is available in the extracted record.
Red Flags
- Seven corrective action requests (CARs) were raised during validation, covering errors in emission reduction calculations, investment analysis, common practice analysis, and monitoring plan inconsistencies — indicating significant PDD quality issues at the time of approval.
- No monitoring reports, verification reports, or verified ERR figures are present in the extracted record, making it impossible to confirm whether the 664,783 tCO2e claimed were actually delivered.
- The grid emission factor of 0.963575 tCO2/MWh is from 2009 and no updated or reassessed value is documented.
- One of the five source documents could not be identified (listed as 'unknown'), reducing confidence in the completeness of the evidence base.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Project-specific, no reassessment documented
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →