Skip to main content
CDMBiomass EnergyMoroccoAMS-I.C

Heat recovery and fuel switch from natural gas to biomass residues implemented at Renault Tanger Méditerranée (RTM) plant – Melloussa, Morocco

CDM-9139 ↗

#190of 352 in Biomass#10of 12 in Morocco#1206of 1459 in CDM (UNFCCC)#60of 115 in AMS-I.C

4.4/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
4.5
Documentation
3.0

Audit Analysis

A CDM biomass fuel-switch project at a Renault plant in Morocco with VVB-confirmed additionality and a reasonable leakage treatment, but undermined by a ten-fold discrepancy in claimed emissions reductions between the PDD and validation report, the absence of any monitoring or verification data, and a low-confidence extraction record. The project's avoidance-based design limits permanence risk, yet the sheer volume of corrective actions (19) during validation and the removal of the investment test from the additionality case raise questions about the robustness of the underlying methodology.

Red Flags

  • Ten-fold discrepancy in total emissions reductions: the PDD (Nov 2012) states 104,682 tCO₂e while the validation report (Dec 2012) states 10,468 tCO₂e — a factor-of-10 error that materially affects the project's claimed impact.
  • No monitoring reports, verification reports, or verified ERR figures were found in the extracted record, leaving the project's actual performance entirely unverified.
  • Nineteen corrective actions were required during validation, including the removal of the investment analysis from the additionality justification (CAR5–CAR9), weakening the additionality case.
  • Grid emission factor is from 2008 and no baseline reassessment date is stated, raising the risk that the baseline no longer reflects current conditions.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but investment test removed

Permanence

Avoidance project, low reversal risk

Leakage

0% deduction, minimal justification

Baseline

Project-specific, 2008 grid EF, no reassessment date

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-I.C & AMS-II.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents