Hebei Chengde Weichang Wuxiangliang Wind Power Project
#1337of 1935 in Renewable energy#812of 1084 in China#1052of 1459 in CDM (UNFCCC)#1037of 1287 in ACM0002
Audit Analysis
A CDM wind project in China with a jurisdictional grid baseline and VVB-confirmed additionality, but the validation report flagged a material deficiency in the common practice analysis (corrective action required) and nine clarifications on IRR and boundary parameters. No monitoring-period data or verified emission reductions were found in the extracted record, and extraction confidence was low, leaving delivery unverified. The project's crediting period (2012–2019) has closed, yet no post-validation monitoring evidence is available.
Red Flags
- Corrective Action 3: the common practice analysis in PDD v01 did not follow the step-wise approach required by the additionality tool v6.0.0, undermining the robustness of the additionality claim despite VVB sign-off.
- No monitoring-period data or verified emission-reduction figures were found in any available document; the 298,032 tCO₂e lifetime claim cannot be cross-checked against actual delivery.
- Nine clarifications (CL 1–CL 9) raised during validation touched on project boundary, IRR assumptions, capacity figures, and data-archiving compliance, indicating a weak initial PDD.
- Low extraction confidence across the document set means several key fields (monitoring period, verified ERR, FN/RB, usage rates) could not be confirmed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but common-practice analysis required correcti
CDM framework, no monitorin
0 % deduction, deemed negligible — consistent for grid-conne
Jurisdictional grid EF (0.8958, 2012) per ACM0002
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →