Hebei Fengning Wanshengyong Wind Power Project
#1319of 1935 in Renewable energy#797of 1084 in China#1045of 1459 in CDM (UNFCCC)#1023of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Hebei, China, using a jurisdictional grid emission factor baseline (0.8404 tCO₂/MWh, 2017) under methodology ACM0002 v19.0. The project presents a fundamentally sound design for a renewable energy avoidance project, but the extracted record has significant evidence gaps—additionality test details, monitoring data, and buffer/permanence provisions are not captured—compounded by low extraction confidence from the source documents.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record; while a validation report (2019-08-02) exists, the specific additionality methodology (investment, regulatory, or barrier test) could not be confirmed from available data
- No monitoring period or verified performance data is available; the claimed and verified ERR figures are identical (1,957,543 tCO₂), suggesting only the ex-ante validation estimate is on record with no subsequent monitoring verification
- Low extraction confidence across the document set means key compliance elements (buffer pool, FNRB, grievance mechanism, FPIC) may be present in the source documents but were not reliably captured
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test likely conducted (validation report exists) but type an
Wind avoidance project; inherently low reversal risk; no rev
Deemed negligible (0% deduction); consistent with grid-displ
Jurisdictional grid-EF baseline (0.8404, 2017); reassessed 2
Safeguards mentioned and benefit sharing described, but FPIC
CORSIA eligibility and CCP status both not stated; dual-chan
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →