Hebei Shangyi Hanjiazhuang Phase II Wind Farm Project
#312of 1935 in Renewable energy#119of 1084 in China#202of 1459 in CDM (UNFCCC)#233of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with VVB-confirmed additionality and inherent permanence (avoidance of grid emissions), but undermined by a baseline-method contradiction between the validation report and the later monitoring report, a 0% leakage deduction with inconsistent justification across reports, and the absence of any verified ERR figure. The project's documentation is reasonably complete with high extraction confidence, yet key MRV data points (verified ERR, FNRB, usage monitoring) are missing from the extracted record.
Red Flags
- Baseline method is stated as 'project' in the 2021 monitoring report but 'jurisdictional' in the 2011 validation report — an unresolved contradiction that could affect the validity of the displacement calculation
- No verified ERR figure is available in the extracted record, making it impossible to confirm whether claimed credits were actually delivered
- Leakage justification is inconsistent: 'quantified' in the 2021 monitoring report versus 'not addressed' in the 2012 monitoring report, despite a 0% deduction in both cases
- Grid emission factor is from 2008 (0.9309 tCO2/MWh) and no baseline reassessment or update is documented for the full 7-year crediting period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 71,638 | 0 | 71,638 | |
| 2015 | 251,071 | 0 | 251,071 | |
| 2022 | 266,849 | 0 | 266,849 | |
| Total | 589,558 | 0 | 589,558 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, inconsistent justification
Method contradiction, 2008 grid EF
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →