Hebei Shangyi Moshishan 49.5MW Wind Farm Project
#858of 1935 in Renewable energy#447of 1084 in China#612of 1459 in CDM (UNFCCC)#672of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Hebei, China, validated under CDM methodology ACM0002 with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The fundamental design is sound for a wind-avoidance project, but the validation report surfaced 14 material findings (7 corrective actions, 7 clarifications) indicating significant initial documentation weaknesses, and no monitoring or verification data is available to confirm actual delivery. The ERR figures in the PDD and validation report differ by a factor of seven, which is consistent with an annual-versus-total reporting confusion but still reflects a documentation inconsistency.
Red Flags
- 14 material findings (7 CARs + 7 CLs) in the validation report, including inconsistencies in financial parameters, generation figures, project title, coordinates, and monitoring plan — indicating the PDD required substantial revision before approval
- No monitoring or verification reports are available in the extracted record; actual ER delivery over the 2012–2019 crediting period cannot be confirmed
- ERR figures differ between the PDD (766,759 tCO₂e) and the validation report (109,537 tCO₂e); while the ratio is consistent with an annual-vs-total confusion (109,537 × 7 = 766,759), the inconsistency was not explicitly reconciled in the documents
- Leakage treatment is contradictory: the validation report states leakage was deemed negligible (0% deduction) while an appendix references a quantified leakage assessment
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind avoidance, no reversal risk
0% deemed negligible; appendix contradiction
Jurisdictional grid EF, standard for wind
Mentioned; FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →